Topgolf required a high‑reach containment system to support safe operation of their multi‑level driving range. Foresport Fencing was appointed to install a Permanent Lattice Mast netting system designed to deliver long‑term durability, strong wind resistance, and minimal visual impact.
Implementation
The project involved installing engineered lattice masts on reinforced foundations, followed by the tensioning of UV‑stable, high‑tensile netting across multiple spans. Specialist access equipment was used to complete the high‑level works safely and efficiently. All installation phases were coordinated around venue operations to avoid disruption.
Outcome
The completed system provides reliable ball containment, a clean and professional appearance, and long‑term structural performance. Topgolf praised the quality of workmanship and the smooth delivery of the project.







