foresport-fencing-ball-stop-netting
Lattice Mast netting system

Topgolf

Client: Topgolf (Glasgow)
Project Date: Dec 2022
Sectors: Sports Centre
Project Type: Golf Netting

Topgolf required a high‑reach containment system to support safe operation of their multi‑level driving range. Foresport Fencing was appointed to install a Permanent Lattice Mast netting system designed to deliver long‑term durability, strong wind resistance, and minimal visual impact.

Implementation

The project involved installing engineered lattice masts on reinforced foundations, followed by the tensioning of UV‑stable, high‑tensile netting across multiple spans. Specialist access equipment was used to complete the high‑level works safely and efficiently. All installation phases were coordinated around venue operations to avoid disruption.

Outcome

The completed system provides reliable ball containment, a clean and professional appearance, and long‑term structural performance. Topgolf praised the quality of workmanship and the smooth delivery of the project.

Roof Netting Design & Installation Urban Sports MUGA in Bath (5)